HomeLog inJoin waitlist
Prototype statusDraft

What is ready and what remains.

A current inventory of the public concept, platform foundation, and intentionally unbuilt product work.

Last updated August 12, 2026Version 0.2
Pre-launch draft

This document is provided for product planning and must be reviewed by qualified counsel before public launch, paid accounts, or customer engineering data are accepted.

On this page
  1. 01Public website
  2. 02Accounts and authentication
  3. 03Platform services
  4. 04PCB workflow
01

Public website

The marketing site, pricing, FAQ, waitlist, login, contact, legal, security, and status surfaces are implemented as a working concept. Design and pricing remain provisional.

02

Accounts and authentication

Email/password signup, verification, password reset, and Google/GitHub entry points are implemented for Preview validation. Verified identity remains separate from private-beta access, which requires a one-time invite key. Production OAuth and enterprise SSO are not enabled yet.

03

Platform services

The Cirqut Vercel project, cirqut.org domain, Neon database, and Managed Better Auth foundation are connected. Preview Auth configuration and invite redemption still require final external setup and end-to-end validation before hosted account creation opens.

04

PCB workflow

Guided board setup, source-document analysis, schematic generation, collaboration, and EDA synchronization have not been implemented. This phase covers the public site, identity boundary, waitlist, tenancy, entitlement, and audit foundations only.

Public website legal drafts · 2026

PrivacyTermsHome